Skip to content
Power protection

UPS and power continuity.

APC, Eaton, Vertiv, CyberPower across SOHO line-interactive, SMB online double-conversion, and rack-mount 3kVA+. Sized for the load, specified for the runtime.

Why these brands

What we stock and why.

Power continuity sits next to storage and surveillance as the third pillar of UAE business IT — utility power is generally reliable but generator-switching events, summer-load brownouts, and the occasional construction-related cut still happen. The UPS layer protects against the seconds-to-minutes gap.

We supply APC, Eaton, Vertiv, and CyberPower across the spectrum — line-interactive SOHO units (1–2kVA), double-conversion online for racks and servers (2–10kVA), and the larger 3-phase systems for data centre rooms (10kVA+). Battery replacement and runtime extensions handled in-house.

Suppliers

Brands we stock for this category.

  • APC
  • Eaton
  • Vertiv
  • CyberPower
How to choose

Four things UAE buyers ask when scoping ups & power.

The factors that actually decide the spec — not the marketing matrix.

  1. 01

    Size the UPS to the load

    Calculate connected load in watts (server + network + monitor + critical). Add 25% headroom. UPS VA rating typically 1.4× the watt load. A 1,000W IT load needs ~1,500VA UPS minimum — undersized UPS deteriorates batteries fast.

  2. 02

    Online double-conversion for servers

    Line-interactive UPS is fine for desktops and basic networking. Servers, NAS, and surveillance NVRs need online double-conversion — no transfer time and clean sine wave output. Specify online for any 24/7 IT load.

  3. 03

    Runtime extension via external batteries

    Internal UPS battery typically gives 5–15 minutes runtime at full load. For longer runtime, attach external battery packs (EBM) — same brand, matched voltage. We size and supply the EBM modules to match the target runtime.

  4. 04

    Plan battery replacement at 3 years

    Sealed lead-acid batteries (most UPS) lose capacity from year 2. Plan replacement at year 3 — overheating UAE batteries last shorter than rated. We stock replacement battery cartridges for the common APC, Eaton, and CyberPower models.

FAQ

UPS & power buyer questions, answered.

Questions that actually come up on quotes. If yours isn't here, WhatsApp us or send the form.

  • For 5–10 desktops with a switch and small NAS, a 1.5–2kVA line-interactive UPS (APC Back-UPS Pro, CyberPower CP1500) covers it. For a server rack with one server + switch + NAS, step up to 2–3kVA online double-conversion (APC Smart-UPS SRT, Eaton 9PX).

  • Internal battery typically 5–15 minutes at full load. With external battery modules (EBM), 30 minutes to 4+ hours depending on configuration. We size battery runtime to the specific gap the customer needs — typically 15–30 minutes is enough for graceful shutdown.

  • We supply the UPS hardware and provide configuration recommendations. Physical installation for rack-mount UPS runs through partner MEP contractors. For smaller line-interactive units, the customer's IT team typically handles installation.

  • Every 3 years in UAE conditions. Higher ambient temperatures shorten battery life — UPS rated for 5 years typically lasts 3 in unconditioned IT closets. Schedule a battery replacement quote at year 3 and renew at year 6.

  • Back-UPS is line-interactive — fine for desktops and basic networking. Smart-UPS is online double-conversion — required for servers and 24/7 IT loads. Price scales accordingly. Specify Smart-UPS for any server or NAS load.

  • Yes — replacement battery cartridges for the common APC RBC-series, Eaton, and CyberPower models stocked in volume. For less common spares (input modules, network management cards), we order on demand with 5–10 business day lead time.

Get started

Send the SKU list. Get a real price.

Quote requests get a same-business-day reply with stock confirmation, trade pricing, and a delivery slot. After-hours calls land 24/7.

Reply within 4 business hours · Calls 24 / 7